Hot Tubs Cluck & Shut Swim Lane & Pools Decking & Gazebos Special Offers
Accessories     l     Chemicals     l     Colour Options    l     Installation     l    Company    l    Model Features
 
A Brief tour of our Factory

 
 
  Step 1

The Spa frames are manufactured using pressure treated 2x4 selected timber

 
 
 
  Step 2

The Vacuum formed "Quarite" moulding is sprayed and rolled with 3 layers of glass fibre for strength
 
 
 
  Step 3

The Motor and Controller department
 
 
 
  Step 4

Drilling and mounting the jets
 
 
 
  Step 5

Before filling with foam the Spa is pressure tested to ensure it is leak free
 
 
 
  Step 6

Finally the Spa is foam filled for maximum insulation before the Redwood cladding is installed
 


 
HOME
 
 

Deckworld Ltd.
Shepherd and Dog Farm, Old Felixstowe Road, IP10 0DE.
Telephone: (01473) 655777 Fax: (01473) 736444

© copyright 2007 Deckworld UK